Most software projects that go over budget do not fail late. They go wrong early, in ways that are only discovered late: a requirement nobody wrote down, an assumption about the data that turned out to be false, a design that looked fine in a meeting but confused real users. The first six weeks are where those problems are cheapest to find.
Here is how we structure the start of a typical web, mobile or machine learning project. Exact timing varies, but the order rarely does.
Week 1: Discovery
We sign your NDA before any detailed conversation, then work through who will use the product, what they need to get done, and what success looks like in numbers. We also identify the riskiest assumption in the project, because that is what the next few weeks should test first.
You get: a short written summary of goals, users, constraints and risks, which both sides agree on before anything is built.
Week 2: Scope and estimate
The goals become a list of features, split into what the first release needs and what can wait. Each item gets an estimate, and anything uncertain is marked as uncertain rather than hidden inside a single number.
You get: a fixed scope for the first release, a timeline and a price, plus a clear list of what is not included.
Weeks 3 and 4: Design and a working skeleton
Screens are designed around the main user tasks and tested with a few real users where possible. In parallel, engineers set up the foundations: the repository you own, the deployment pipeline and a thin working version of one complete flow, from login through to the core action.
For machine learning projects, this is when we clean the data, lock the test set and train a simple baseline, so you can see early whether the signal is strong enough.
You get: clickable designs and a first working build you can try on your own device.
Weeks 5 and 6: The first real features
With the foundations in place, features are built in priority order. Every week ends with a demo call at a time that suits your time zone, where you see working software, not slides. Feedback goes straight into the next week's plan.
You get: a weekly demo, access to the code repository and a running list of decisions and open questions.
Signs the start is going well
- You have seen working software by week four, not just documents.
- Risks and unknowns are written down and shrinking each week.
- You can name the one person accountable for the project, and reach them.
- Changes to scope are discussed openly, with their cost, before they are built.
The takeaway
A good start is not about speed. It is about turning assumptions into evidence as early as possible. If your first six weeks produce agreed goals, a fixed scope, a working build and a weekly rhythm of demos, the rest of the project has a solid foundation.